METALLIC FLOORING SYSTEM – Step 4
Step 4: OPTIONAL: Maintenance Coating
Product: INFUSION® Industrial Floor Finish
Application Instructions:
- Apply at least 45 days after topcoat from Step 3.
- Burnish coating, if desired.
- For more information, please refer to the Product Data Sheet.
Stiff broom, Garden hose with a pressure washer nozzle, Buckets, Mixer, Eye Protection, Respiratory Protection, Gloves, Roller, Squeegee, Brush, Spiked Shoes.
Additional information
Available in 1 Gallon, 1 Quart, 2 Gallon, 4 Gallon and 5 Gallon. |