METALLIC FLOORING SYSTEM – Step 4

Step 4: OPTIONAL: Maintenance Coating

Product: INFUSION® Industrial Floor Finish

Application Instructions:

  • Apply at least 45 days after topcoat from Step 3.
  • Burnish coating, if desired.
  • For more information, please refer to the Product Data Sheet.
Stiff broom, Garden hose with a pressure washer nozzle, Buckets, Mixer, Eye Protection, Respiratory Protection, Gloves, Roller, Squeegee, Brush, Spiked Shoes.

Additional information

Available in 1 Gallon, 1 Quart, 2 Gallon, 4 Gallon and 5 Gallon.